Additional Remediation Efforts

Complementary to its mission of eliminating groundwater contamination at and around the former ABC facility, Lockheed Martin has undertaken other measures to benefit the environmental remediation activities at and around the former ABC facility.

Work Plan for Building Slab Removal and Well Search and Abandonment    February 15, 2011                                                                                                                            Building slab removal and well search and abandonment activities are described in this work plan, prepared by AECOM Technical Services, Inc. This work was necessary to facilitate the construction of the proposed groundwater treatment plant detailed in the approved Remedial Action Plan Addendum (RAPA), and the installation of proposed groundwater extraction and injection wells and associated piping.

Buildings 4 & 5 Demolition & Soil Excavation – ABC Facility
Lockheed Martin believed that Buildings 4 & 5 at the former ABC site, and the soil there, impacted the groundwater in the vicinity of former sumps. Explore the work plans that detail the demolition of these buildings and the removal of the affected soil there.

Interim Source Removal
On August 3, 2008, approximately 5,000 gallons of recovered groundwater were released from a secondary containment unit that is part of the groundwater treatment system at the former ABC facility site. Explore documents that detail how Lockheed Martin discovered and treated this problem.