Middle River Documents


 

PLEASE NOTE THAT SOME OF THESE TECHNICAL DOCUMENTS ARE EXTREMELY LARGE  AND MAY TAKE A WHILE TO OPEN

 

 

 

2014

Block G Soil Remedial Action Plan January 2014

Block F Soil Remedial Action Plan January 2014

2013

Block D Panhandle Soil Remedial Action Plan December 2013

Block D Soil Remedial Action Plan November 2013

Groundwater Monitoring Report, March-May 2013

Tax Block H Soil Remedial Action Plan (RAP)

Groundwater Response Action Plan July 2013

Work Plan Addendum Indoor Air and Sub-Slab Vapor Sampling Round 15, August 2013

Groundwater Response Action 100% Design Basis Report, Sept. 2013

Groundwater Use Investigation Report, September 2013

Operation and Maintenance Manual: Sub-Slab Depressurization System—Building C, September 2013

Letter Report: Additional Indoor Air and Sub-Slab Vapor Monitoring, Building A Sub-Slab Depressurization (SSD) Shutdown, September 2013

Construction Documentation, Sub-Slab Depressurization System, Second-Phase Expansion – Building C, September 2013

Vapor Intrusion Investigation, and Sub-Slab-Depressurization-System Operation, February 2013 Monitoring Report, September 2013

Supplemental Investigation Block E and Block I 2013 Work Plan August 2013

Feasibility Study for the Remediation of Sediments Adjacent to Lockheed Martin Middle River Complex, July 2013

Sediment Remedy Design Investigation Work Plan Middle River Complex, July 2013

PCB Bioavailability Reductions by Activated Carbon

Technical Papers Supporting Sediment Feasibility Study

 

2012

Feasibility Study for the Remediation of Sediments Adjacent to Middle River Complex, December 2012

2012 Additional Block E Soil  Investigation Report

Surface Water Sampling Report November 2012

Human Health Risk Assessment for Blocks D, E, F, G, and H Soils, September 2012

Vapor Intrusion Management Plan September 2012 

Injection Pilot Study Report 09 05 12

Surface Water Sampling Work Plan - August 2012

Vapor Intrusion Investigation and SSDS Operation August 2012 Monitoring Report

Final Blocks E Pre Design Soil Sampling Work Plan 06 29 12

Groundwater Monitoring Report April 2012

Vapor Intrusion Investigation and SSDS Operation February 2012 Monitoring Report

Sediment Remediation - Public Information Session Presentation - January 2012

Frequently Asked Questions - Block E Storm Drain Interim Remedial Measure - January 2012

 

2011

Ground Water Monitoring Report, March - May 2011 - December 2011

Supplemental Block I Characterization Report - June 2011

Vapor Intrusion Investigation and SSDS Operation August 2011 Monitoring Report

Interim Remedial Measures Design Report - Block E Storm Sewer System - Revised May 2011

Sediment Characterization Report for Cow Pen Creek and Dark Head Cove - Revised May 2011

Indoor Air and Sub-Slab Vapor Sampling Work Plan Addendum - Round 10 - June 2011

2011 Groundwater Monitoring Work Plan - May 2011

Sediment Risk Assessment - May 2011

Fish Tissue Report - April 2011

Sediment Sampling Data Summary Report - March 2011

Block B Construction Report, Soil Response Action - February 2011

Vapor Intrusion Investigation and SSDS Operation February 2011 Monitoring Report 

Deep Groundwater Investigation Report Addendum - January 2011

Vapor Intrusion Investigation and Sub-Slab Depressurization System Operation - January 2011

 

2010

Ground Water Monitoring Report, May - June 2010

Vapor-Intrusion Management Plan - December 2010

Vapor Intrusion Investigation and Sub-Slab Depressurization System Operation February 2010 Sampling Report

Block E Supplemental Soil and Storm Drain Sediment Characterization Report - October 2010

Final Deep Groundwater Investigation Report - October 2010

Deep Groundwater Investigation Work Plan - November 2010

Data-Gap Soil Sampling Work Plan - Blocks D, F, G and H - September 2010

Supplemental Block I Characterization Work Plan - September 2010

Characterization and Sediment Sampling Work Plan - September 2010

Indoor Air and Sub-Slab Vapor Sampling Work Plan Addendum - Round 9 - August 2010

Vapor Intrusion Investigation and Sub-Slab Depressurization System Operation 2009 Summary Report

Groundwater Monitoring Work Plan - May 2010

Soil Response Action Plan - Block B - May 2010

Groundwater Monitoring Report, July - August 2009

 

2009-2007

Groundwater Monitoring Report, July - August 2008

Soil Response Action Plan - Groundwater - April 2008

Soil Response Action Plan - Block D - April 2008

Soil Response Action Plan - Block E & E Lot 3  - April 2008

Soil Response Action Plan - Block F - April 2008

Soil Response Action Plan - Block G Lot 1 - April 2008

Soil Response Action Plan - Block H - April 2008

Final Offsite Groundwater Characterization Report September 2007

Final Indoor Air Quality Investigation Buildings A, B, C, and VLS; September 2007

 

2006-1998

Historical Review Summary Report July 2009

Final Radiological Survey Report for Former Building D April 2004

Groundwater Use Investigation Report April 2006

Surface Water Sediment Report April 2006

Vol. I and II Phase II Site Investigation Of Exterior Areas

Data Report Site-Wide Phase II Investigation April 2005

Middle River Site Characterization Report May 2006